|
The cement footings have been poured, and a layer of cement blocks have been put on top. I have no idea what the cement blocks are to be used for. What I do know is, is that the blocks are at two different levels. Looking at the house, the blocks to the left side are about one inch higher then the blocks on the left side.
| |
|
|
|
|
|
| P1010009 | P1010010 | P1010011 | P1010012 | P1010013 | P1010014 |
| |
|
|
|
|
|
| P1010015 | P1010016 | P1010017 | P1010018 | P1010019 |