|
The plumber came in today and laid the lines for heat and waste. We have decided to go for two zones. One will be for the bedroom which can be seen in photo P1010030 . The second zone will be for the rest of the area. The waste line (seen in photo P1010027), will connect to a dry well. We are only using it for the kitchen sink and washing machine. The drywell will go in after the slab is poured.
| |
|
|
|
|
|
| P1010024 | P1010025 | P1010026 | P1010027 | P1010028 | P1010029 |
| |
|
|
|
||
| P1010030 | P1010031 | P1010032 | P1010033 |