Things have been hectic. These are some general shots of the new bathroom, the outside of the house, and the general area. When doing construction you have to expect a lot of garbage, both inside the house and outside. The guys have been pretty good at keeping things clean, but Debbie, and I do spend time cleaning up. In fact we spent one whole Sunday (October 27) cleaning up. All the garbage you see here in these photos we cleaned up. The yard looked a lot better after that, and we felt good, about doing it. After a few very cold nights, we had the contractor put the chimney back outside temporarily. Until this was done we would turn the burner on, make hot water and then turn it off, since the fumes where venting in to the extension.